Widening of the Existing Penang Bridge From East Abutment to Pier 24E and From Pier 24W to Pier 69WBridge Nos. 3, 7 & 8 Uni-Directional Ramps

Employer: Penang Bridge Sdn Bhd

Employer’s Representative: Opus Management Sdn Bhd

Engineer: HSS Integrated Sdn Bhd

Main Contractor: UEM Construction Sdn Bhd

Commencement Date: February 2007

Completion Date: August 2009

Bridge Structure Widening:

  • The structure widening of 3.80 m to one side of the Bridge No. 3 & Bridge No. 7 inclusive of 2.0 m paved shoulder.
  • The structure widening of 4.80 m both side of the Bridge No. 8 inclusive of 2.0 m paved shoulder.

At Grade Widening: At Grade road to be widened to an additional 2.0 m wide and undergo 6 months surcharge period.

Length Bridge to Be Widened: 5.76 km