Project Details

UEM Builders was the main facilities contractor for the Kuala Lumpur Light Rail Transit System 2 (LRT 2).

 

The scope of work involved the construction of a 29-km track (comprising 22 km of elevated guideway, 5 km underground track and 2.5 km at grade) linking Petaling Jaya to Gombak.

 

The project included the construction of 24 LRT stations, of which 17 are above ground, 5 underground and 2 at grade.

 

The LRT 2 project presented major engineering and construction challenges and set new standards for the Malaysian construction industry.

 

Piling works called for a variety of innovative solutions to suit the different terrain traversed by the LRT 2 route. The project includes the construction of two underground stations located along the Klang River in the city centre.

 

Field

  • Infrastructure